{"id":3711,"date":"2026-11-03T10:06:19","date_gmt":"2026-11-03T02:06:19","guid":{"rendered":"http:\/\/www.hewilson.com\/blog\/?p=3711"},"modified":"2026-11-03T10:06:19","modified_gmt":"2026-11-03T02:06:19","slug":"how-to-connect-the-earthing-bar-in-an-lv-distribution-board-47ee-b3ede3","status":"publish","type":"post","link":"http:\/\/www.hewilson.com\/blog\/2026\/11\/03\/how-to-connect-the-earthing-bar-in-an-lv-distribution-board-47ee-b3ede3\/","title":{"rendered":"How to connect the earthing bar in an Lv Distribution Board?"},"content":{"rendered":"<p>If you\u2019ve ever opened the door of a low-voltage (LV) distribution board in a commercial or industrial space, you\u2019ve probably noticed a thick, copper bar running along the bottom or side, connected to the main earthing terminal. That\u2019s the earthing bar\u2014often called a main equipotential bonding bar\u2014and getting it connected correctly isn\u2019t just a technical step, it\u2019s the foundation of electrical safety. As someone who\u2019s supplied LV distribution boards for over a decade, I\u2019ve seen first-hand how a half-baked earthing bar connection can turn a small electrical fault into a fire hazard, or worse, an injury to someone on site. I\u2019ve also seen how a properly executed connection gives installers and building owners peace of mind that their system meets all local regulations and will stand the test of time. <a href=\"https:\/\/www.nxelepower.com\/distribution-cabinet\/lv-distribution-board\/\">Lv Distribution Board<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.nxelepower.com\/uploads\/47704\/small\/socket-and-switch-boxd8bdd.jpg\"><\/p>\n<p>Today, I want to walk you through exactly how to connect an earthing bar in an LV distribution board, based on the standards we design every board to. This isn\u2019t generic advice pulled from a manual; this is the step-by-step process we share with our certified installers and the reason our boards have a 99% pass rate on electrical inspections. Before we get into the steps, let\u2019s cover why this matters so much. The earthing bar\u2019s job is to provide a low-resistance path for fault current to flow safely to the earth, rather than through metal parts of the building, equipment, or even people. If that connection is loose, corroded, or undersized, fault current can\u2019t dissipate properly, leading to overheating, arc flashes, or electric shock. It\u2019s the unsung hero of electrical safety, and it deserves the same attention as any other component in your distribution board.<\/p>\n<p>First, let\u2019s set the ground rules: these steps align with IEC 60439-1, the international standard for low-voltage switchgear and controlgear assemblies, as well as most regional standards like NEC in North America and BS 7671 in the UK. Before you touch any components, turn off all power to the distribution board at the main supply. Double-check with a non-contact voltage tester to confirm there\u2019s no live current present\u2014this is non-negotiable. Even if you\u2019re experienced, powering down and verifying zero voltage is the difference between a safe job and a trip to the emergency room.<\/p>\n<p>Step one: Inspect the earthing bar and its components. When our boards leave our warehouse, every earthing bar is made from solid, tinned copper (tinning prevents corrosion, which is a common cause of high-resistance connections down the line) sized to match the maximum fault current the board will handle. Most standard LV distribution boards we supply have a 25mm\u00b2 or 35mm\u00b2 main earthing bar, but we always size it according to the board\u2019s rating\u2014we never undersize components to cut costs, because we know that saves no one money in the long run. You\u2019ll also need the right accessories: M8 or M10 galvanized steel bolts (galvanization prevents rust), lock washers, flat washers, and a torque wrench. Using the wrong size bolt is a quick way to a loose connection, so cross-reference your board\u2019s manual (we include a detailed manual with every unit we ship) to confirm the correct bolt size for your specific bar.<\/p>\n<p>Step two: Prepare the termination points. This is where a lot of installers cut corners, and it\u2019s the most common reason for earthing bar failures. First, inspect the back of the earthing bar and the mounting surface in the distribution board where the bar will sit. If there\u2019s any dust, oil, or old corrosion (if the board was used before, or if the mounting surface was damaged in transit), wipe it down with a lint-free cloth and isopropyl alcohol. Never use a wire brush to clean copper surfaces\u2014bristles can break off and get caught in the board, leading to shorts. If the bar has any scratches or dents where you\u2019ll be mounting it, gently sand the area with 200-grit sandpaper until it\u2019s smooth, then wipe away the dust. Next, take the earthing conductors (the wires that will connect from the bar to the main earth electrode, sub-circuit earths, and equipment earths) and prepare their ends too. Strip the insulation to the correct length\u2014usually between 10mm and 15mm\u2014using a wire stripper designed for the conductor size. Don\u2019t over-strip, because exposing too much copper can lead to accidental contact with live parts. If you\u2019re using stranded conductors (which we recommend for flexibility), twist the ends tightly so no strands stick out; loose strands can cause arcing or poor conductivity.<\/p>\n<p>Step three: Mount the earthing bar to the distribution board chassis. The bar should be mounted on non-conductive spacers, not directly against the metal chassis. This is for two reasons: first, it ensures the bar is stable and won\u2019t move as you add conductors, and second, it prevents the bar from picking up stray currents that could interfere with sensitive equipment connected to the board (like building management systems or control panels). Align the bar with the pre-drilled mounting holes on the chassis\u2014our boards are drilled with precision CNC equipment, so the holes line up perfectly every time, no drilling required on site, which saves installers hours. Thread the bolts through the bar, then through the spacers and the chassis, and add a flat washer and lock washer on the back side. Before tightening, make sure the bar is level and straight\u2014you can run your hand along the top to check for gaps or unevenness. Then, use the torque wrench to tighten the bolts to the manufacturer\u2019s specified torque. Most standard earthing bar mounting bolts need to be tightened to between 8 Nm and 12 Nm\u2014over-tightening can strip the bar\u2019s thread or crack the chassis, while under-tightening creates a loose connection. If you don\u2019t have a torque wrench, borrow or buy one; guessing tightness is a mistake that comes back to haunt you during inspections.<\/p>\n<p>Step four: Connect the main earthing conductor to the bar. This is the conductor that runs from the distribution board to the main earth electrode (usually a ground rod driven into the earth outside the building). For this connection, you\u2019ll use the largest conductor in the earthing system\u2014usually sized to match the board\u2019s rating, often 16mm\u00b2 to 50mm\u00b2. There are two common ways to connect it: either through a terminal block attached to the earthing bar, or directly by tightening the conductor under a bolt on the bar. We recommend using a terminal block for larger conductors, because it makes future upgrades or replacements easier. Slide the prepared end of the main conductor into the terminal block, tighten the bolt until it\u2019s secure, then attach the terminal block to the earthing bar using another bolt and washers. If you\u2019re connecting the conductor directly to the bar, make sure it\u2019s seated flat against the bar, with no gaps between the conductor\u2019s end and the bar. Tighten the bolt to the correct torque, then give the conductor a gentle tug to confirm it\u2019s not loose. Once the main conductor is connected, run it along the interior of the distribution board, securing it with cable clips every 150mm to 200mm\u2014this prevents the conductor from touching live busbars inside the board, which is a safety hazard.<\/p>\n<p>Step five: Connect sub-circuit earth conductors and equipment earths. This is where the equipotential bonding happens\u2014all sub-circuit earth wires (from breakers, lighting circuits, power outlets, etc.) and equipment earths (from large appliances like air conditioners or boilers connected to the board) get connected to the earthing bar. Each connection here needs to be just as secure as the main connection. For sub-circuit conductors, which are often 2.5mm\u00b2 or 4mm\u00b2, we recommend using the small screw terminals that come pre-installed on our earthing bars\u2014these are designed for multiple small conductors, so you don\u2019t have to bunch wires together under a single bolt. If you do need to connect two conductors under one bolt (for example, if you\u2019re adding a new circuit later), make sure they\u2019re both sized correctly, and tighten the bolt to the right torque. Never cram more than three small conductors under a single bolt\u2014this increases the risk of loose wires and poor conductivity. As you connect each conductor, label it with a small tag or marker so you can easily identify which circuit it belongs to later. This makes maintenance and troubleshooting way easier down the line.<\/p>\n<p>Step six: Test the connection. This is the final, non-negotiable step before closing the distribution board. You need to test the resistance of the earthing path to confirm it\u2019s below the required limit (most standards require a maximum resistance of 0.5 ohms for LV systems, though some areas specify lower for certain applications). Use a low-resistance ohmmeter (also called a micro-ohmmeter) for this test\u2014regular multimeters won\u2019t give you an accurate reading for low resistance. Connect one probe to the main earthing conductor where it exits the distribution board, and the other probe to a known good earth point (like the ground rod). A reading above 0.5 ohms means there\u2019s a problem with your connection\u2014loose bolts, corrosion, or a conductor that\u2019s not seated properly. Go back, check all your connections, tighten the bolts to the correct torque, clean any corroded surfaces, and test again until you get a reading within the limit. Never close the board without doing this test\u2014even if the connections look tight, a bad resistance reading is a hidden fault waiting to cause harm.<\/p>\n<p>Now, as an LV distribution board supplier, I want to add a few tips that we\u2019ve learned from working with installers across the globe over the years. First, always use copper conductors for earthing connections. Aluminum conductors are cheaper, but they corrode faster and have higher resistance, which can lead to poor connections over time. We only use copper in our boards for this exact reason. Second, never paint or coat the earthing bar or conductors after connection. Paint creates an insulating layer that increases resistance, defeating the whole purpose of the earthing system. If the board is in a dusty or dirty environment, install a dust cover once it\u2019s fully connected to protect the components. Third, if you\u2019re modifying an existing distribution board, never change the size of the earthing bar without checking the board\u2019s rating. Our custom boards are designed with earthing bars matched to the maximum load, and swapping to a smaller bar can compromise safety.<\/p>\n<p>I know that a lot of installers treat earthing bar connections as a routine, \u201ccheck it off the list\u201d step. But every time I get a call from a client that failed an inspection because of a loose earthing connection, or a technician that had a close call because of faulty grounding, I remember how important this step is. As a supplier, our job isn\u2019t just to sell you a distribution board\u2014it\u2019s to make sure you can install it safely and correctly. That\u2019s why we include free technical support with every order, so if you\u2019re unsure about any step, you can pick up the phone or send an email and talk to one of our certified engineers who actually builds and tests the boards we sell.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.nxelepower.com\/uploads\/47704\/small\/high-voltage-incoming-cabinetc93d1.jpg\"><\/p>\n<p>If you\u2019re working on an LV distribution board project, or you need a reliable supplier for high-quality, safety-compliant distribution boards, we\u2019re here to help. Whether you need standard boards for a small office or custom units for a large industrial facility, our team can work with you to design a solution that meets your needs and local regulations. Reach out to our procurement team to discuss your project, ask questions about installation, or get a quote. We\u2019re committed to providing products that don\u2019t just meet standards, but exceed them, because your safety is our top priority.<\/p>\n<p><a href=\"https:\/\/www.nxelepower.com\/distribution-box\/secondary-distribution-box\/\">Secondary Distribution Box<\/a> References<br \/>\nIEC 60439-1: Low-voltage switchgear and controlgear assemblies &#8211; Part 1: General rules<br \/>\nBS 7671: Requirements for electrical installations (IET Wiring Regulations)<br \/>\nNational Electrical Code (NEC) Article 250: Earthing and Bonding<\/p>\n<hr>\n<p><a href=\"https:\/\/www.nxelepower.com\/\">Anhui Nanxian Electric Co., Ltd.<\/a><br \/>With abundant experience, we are one of the most professional lv distribution board manufacturers and suppliers in China. We warmly welcome you to buy advanced lv distribution board for sale here and get quotation from our factory. All customized products are with high quality and low price.<br \/>Address: Factory Unit 03-2, Building 21, Feidong Yinfeng Industrial Park Co., Ltd., Northeast Corner of Manquan Road and Changle Road, Hefei Circular Economy Demonstration Park, Feidong County, Hefei City, Anhui Province.<br \/>E-mail: 541580567@qq.com<br \/>WebSite: <a href=\"https:\/\/www.nxelepower.com\/\">https:\/\/www.nxelepower.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019ve ever opened the door of a low-voltage (LV) distribution board in a commercial or &hellip; <a title=\"How to connect the earthing bar in an Lv Distribution Board?\" class=\"hm-read-more\" href=\"http:\/\/www.hewilson.com\/blog\/2026\/11\/03\/how-to-connect-the-earthing-bar-in-an-lv-distribution-board-47ee-b3ede3\/\"><span class=\"screen-reader-text\">How to connect the earthing bar in an Lv Distribution Board?<\/span>Read more<\/a><\/p>\n","protected":false},"author":138,"featured_media":3711,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[3674],"class_list":["post-3711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-lv-distribution-board-4ed3-b43271"],"_links":{"self":[{"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/posts\/3711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/users\/138"}],"replies":[{"embeddable":true,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/comments?post=3711"}],"version-history":[{"count":0,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/posts\/3711\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/posts\/3711"}],"wp:attachment":[{"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/media?parent=3711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/categories?post=3711"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.hewilson.com\/blog\/wp-json\/wp\/v2\/tags?post=3711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}